The new cavern is 600,000 cubic metres in size and will be used for storage of crude oil. This is our second crude cavern in Port of Gotenburg.
Picture above is the fisrt vessel to arrive, Front Ocelot.
The new cavern is 600,000 cubic metres in size and will be used for storage of crude oil. This is our second crude cavern in Port of Gotenburg.
Picture above is the fisrt vessel to arrive, Front Ocelot.